400-kV GIS Transmission Substations

Design and commissioning of the Punta de Palmas and Peonías substation complexes. Gas-insulated technology for a strategic energy transition.

Location
Latin America
AWARDED IN
2017
Discipline
High-Voltage Electromechanics
Availability
24 / 7
Overview

Gas-insulated technology for a strategic energy transition.

Space constraints and the need for high corrosion resistance in industrial environments.

This project involved the engineering, procurement, fabrication, supply, installation, testing, and commissioning of two substations (Punta de Palmas Substation and Peonías Substation) located on the eastern and western coasts.

These substations are strategically located to facilitate the transition from overhead power lines to submarine and underground cables, helping to improve electricity service in the northwestern region of Lake Maracaibo and benefiting a population of more than 2,000,000 people. The initiative also includes the supply, installation, testing, and commissioning of two 400-kV lines in the eastern and western sections, connecting the substations to the existing line and dismantling the towers along the onshore section.

We implemented 400-kV Gas-Insulated Substation (GIS) technology. This state-of-the-art solution not only optimized the physical space of the facility but also shielded critical components from external factors, drastically reducing long-term operating costs and maximizing system availability.
Contrato EPC para dos subestaciones de transmisión de 400 kV con aparamenta aislada en gas

Technical Scope

Installation of SF6-insulated bay units

Configuration of busbars and transformers

SCADA Integration in Compliance with IEC 61850

Specialized Civil Construction Projects

Optimization of physical footprint and maintenance

No incidents reported.

The operation was carried out in accordance with corporate HSE policies and project-specific risk management plans.